Product Description and Uses
home
Product Description and Uses
Completed Projects and Reference
Photo Gallery
Contact Us
Dura Trails
 

 

 
Applications - Environment Safety

Dust Control, Slope Erosion and Road Development

Product Aplications
  • Construction site dust control
  • Slope erosion
  • Graded Pad Stabilization
  • Construction access roads
    and secondary roads
  • Sports Fields
  • Trail Development and
    Stabilization
  • Parking Lots
  • Landfill caps
  • Many other applicable uses


jim@duraroad.com
rcmc339419@aol.com
2.5 miles - completed 2006
Dust and Erosion Control Victorville
A DuraRoad solution sprayed onto a slope or level surface will effectively bind soil particles together to resist ambient dust as well as wind and water erosion. It is the best solution for sites that naturally create pollution by throwing off dust, such as construction sites, agricultural operations, freeway embankments and unpaved freeway medians.

DuraRoad will not change the appearance of the native soil, and preserves the natural look of the application site after the cure period.

DuraRoad can successfully stabilize many different kinds of soils, including sand, gravel, silt, clays, or combinations thereof.

The application method for DuraRoad varies depending on soil conditions. The curing time depends on the soil type and weather conditions at the time of application. Typically it will cure in 3 hours and reach full strength in 72 hours.